Use of traveler to support forms and provide work platform for erection and stripping on 1/2-mi link in approach system of George Washington Bridge at New York City; load of deck concrete was carried directly to footing by vertical timber supports of heavy traveler frame; cost about $1,000,000.
Traveler speeds arch viaduct forms
Eng News-Rec
Engineering News-Record ; 125 , n 11
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A traveler for viaduct erection
Engineering Index Backfile | 1908
|Erection traveler for the genesee river viaduct
Engineering Index Backfile | 1908
The Arbre viaduct: a new design for high speeds
British Library Online Contents | 1999
|Retirement of old viaduct speeds traffic on two railroads
Engineering Index Backfile | 1943
Articles - The Arbre viaduct: A new design for high speeds
Online Contents | 1999
|