Approach used by American Bosch Arma Corp, in establishing reliability program in design, manufacture and testing of Atlas Missile Guidance System; 3 areas of program -- control, evaluation, and reporting; organization and various functions; results obtained.
Cutting cost of reliability
Aerospace Mgmt
Aerospace Management ; 4 , n 9 ; p 26-31
1961
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2005
Online Contents | 1996
British Library Conference Proceedings | 1994
|British Library Online Contents | 2004
Cutting the cost of authorisation
Tema Archive | 2010
|