Data from the annual report of Edmund S. Davis. Features of work on the Dorchester tunnel extension. (1200 w.) (83,264)
Progress on the Boston subway
Ry Rev
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
Engineering Index Backfile | 1896
Progress on the East Boston subway and tunnel
Engineering Index Backfile | 1902
Engineering Index Backfile | 1899
Engineering Index Backfile | 1898