Illustrated description of the first line equipped for working with single-phase alternating current of high tension and frequency, which has been in satisfactory operation for 15 months. (in Elektrische Bahnen und Betriebe) (Serial. 1st part) (3000 w.) (No. 74285 A)
The Stubai valley railway
Elec Engr., Lond
1905
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1907
Engineering Index Backfile | 1905
Engineering Index Backfile | 1907
Engineering Index Backfile | 1905
|Alpine Glacier Crevasses - Stubai, Oetztal, Grossglockner, Ortler, Piz Palue, 0.2m
Mobilithek
|