Account of corrosion tests carried out in Moffat tunnel; methods studied for prevention of corrosion of rail and fastenings; investigation to date shows that running surface of rail cannot be adequately protected and that various non-metallic coatings are penetrated in too short a time to be of any practical value.
Study of corrosion of rail and track fastenings in Moffat Tunnel
Am Ry Eng Assn -- Bul
American Railway Engineering Association -- Bulletin ; 43 , n 425
1941
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fighting rail corrosion in 6.21-mile Moffat tunnel
Engineering Index Backfile | 1938
|Fighting rail corrosion in 6.21-mile Moffat tunnel
Engineering Index Backfile | 1938
|Fighting rail corrosion in 6.21-mile moffat tunnel
Engineering Index Backfile | 1939
|Rail fastenings for two track gauge
IuD Bahn | 2012
|Engineering Index Backfile | 1964