Critical discussion of speed problem, based on report that Cunard Line has placed order for construction of 4-day steamer with John Brown and Co., Clydebank; proposed dimensions and characteristics of ship are given and discussed.
Projected 4-day express steamer of the Cunard Line
Der geplante 4-tage-Schnelldampfer der Cunard Line
Schiffbau und Schiffahrt ; 31 , n 13
1930
3 pages
1 Fig.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The electrical equipment of the Cunard express steamer " Mauretania."
Engineering Index Backfile | 1908
|The cunard twin-screw geared turbine steamer "franconia"
Engineering Index Backfile | 1923
The speed of the Cunard turbine steamer "Lusitania."
Engineering Index Backfile | 1908
|SLUB | 2012
|SLUB | 2012
|