Specification of electrified routes now totaling 323 km. single track and 300 km. double track; organization of construction; electric lines; power supply and track conditions; Matinitz, Stubach, Ruetz and Spullersee hydroelectric plants totaling 90,000 hp. installed capacity; locomotive equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electrification of Austrian federal railroads until end of 1929


    Additional title:

    Die Elektrisierung der Oesterreichischen Bundesbahnen bis Ende 1929


    Contributors:

    Published in:

    Publication date :

    1930


    Size :

    20 pages


    Remarks:

    19 Figs., bibliography


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German




    Electrification of Austrian federal railroads

    Heydmann | Engineering Index Backfile | 1930


    Electrification of former Austrian Federal Railroads

    Dittes, P. | Engineering Index Backfile | 1938


    Electrification of former Austrian Federal Railroads

    Dittes, P. | Engineering Index Backfile | 1938


    Electrification of former Austrian Federal Railroads

    Dittes, P. | Engineering Index Backfile | 1938


    Electrification of Austrian railroads

    Orel, W. | Engineering Index Backfile | 1938