Construction of vehicular tunnel of semi-circular section with 14-ft radius on 5-ft springline solving difficult highway-location problem on major approach route; driving procedure modified as work progressed to increase daily advance from 5.6 to 18 ft; ventilation system; drilling diagrams of tunnel driving; concrete lining and paving; driving, with both heading and bench-drilling; curved bars used in drilling wing holes.
Driving 4,230-ft tunnel in Yosemite National Park
Eng News-Rec
Engineering News-Record ; 111 , n 3
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Air Quality and Transportation at Yosemite National Park
British Library Conference Proceedings | 1998
|Integrated Transportation and User Capacity Research in Yosemite National Park
Transportation Research Record | 2009
|Integrated Transportation and User Capacity Research in Yosemite National Park: The Numbers Game
Online Contents | 2009
|