Notable features of installation between Goole and Staddlethorpe, L.N. E.R., are control of swing bridge over River Ouse by relay interlocking and trickle charging of batteries for point and signal operation by means of rectifiers from overhead a-c transmission line; signaling diagram.
Battery-operated colour-light signals
Ry Gaz
Railway Gazette ; 58 , n 23
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Battery-operated colour-light signals on London and north eastern railway
Engineering Index Backfile | 1934
New German colour-light signals
Engineering Index Backfile | 1955
Four-aspect colour light signals
Engineering Index Backfile | 1926
Colour-light distant signals on L.M.S.R.
Engineering Index Backfile | 1943
Colour light signals for road traffic
Engineering Index Backfile | 1928