New track construction and building of new station in connection with electrification of London-Brighton Line of Southern Railway, England; details of cable lead to conductor rail through hook switch; alignment for high-speed running; method of bonding conductor rails and running rails; hook switch for isolating sections of track. (see also Tramway and Ry World v 73 n 2 Jan 12 1933 p 10-5)
Southern Railway's electrification extension
Ry Gaz
Railway Gazette ; Supp
1932
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern Railway's electrification extension
Engineering Index Backfile | 1933
Southern railway's "Pacifics,"
Engineering Index Backfile | 1944
|Electrification of the Swiss railway's Gotthard line
Engineering Index Backfile | 1922
|Southern railway's new terminals
Engineering Index Backfile | 1928
Southern Railway's modernization of wayside signaling
Tema Archive | 1986
|