Amount represents unreplaced service mileage actually "run out" of equipment in past 3 1/2 yr; figures compiled by Interstate Commerce Commission, Bureau of Statistics, and by American Railway Assn, Car Service Division; now is time to build for future requirements; how estimate of deferred maintenance was made.
Deferred freight-car maintenance exceeds $300,000,000
Ry Age
Railway Age ; 95 , n 18 ; p 597-599
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1915
|Deferred maintenance -- How much?
Engineering Index Backfile | 1939
Purifier exceeds EPA requirements
Online Contents | 2012
Engineering Index Backfile | 1917
|DEFERRED AIRCRAFT MAINTENANCE IMPACT ASSESSMENT APPARATUS, SYSTEM AND METHOD
European Patent Office | 2016
|