Construction of landing jetty at Le Verdon, France, with direct rail connection to Bordeaux, founded on 96 cylinder caissons sunk by sand-ejection process; details of supporting reinforced-concrete caissons and sinking equipment; telescopic axle for suspending caisson while lowering it to position for sinking.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Concrete caissons sunk by air-lift pumping


    Additional title:

    Eng News-Rec


    Published in:

    Publication date :

    1933


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Pneumatic caissons sunk 110 ft. For Vicksburg bridge

    Stowell, R.G. | Engineering Index Backfile | 1929


    Reinforced concrete ship caissons

    Bailey, S.C. | Engineering Index Backfile | 1953


    Reinforced concrete caissons for marine works

    Bailey, S.C. | Engineering Index Backfile | 1946


    Pneumatic caissons

    Thomson, T.Kennard | Engineering Index Backfile | 1908


    Concrete Box Caissons Earth-Retaining Wharf Structure

    Maynard, J. K. / ASCE / Committee on Ports and Harbors| Permanent International Association of Navigation Congresses et al. | British Library Conference Proceedings | 1995