Procedure used by Sperry Gyroscope Co, Great Neck, NY, where plant covers 2,500,000 sq ft of floor space, and some 40 electric power trucks are required for internal transportation; truck costs were cut by scheduling battery and truck servicing, daily work reports and setting up complete equipment records; one man per shift handles maintenance.
Planned maintenance cuts truck costs
Mill Factory
Mill and Factory ; 57 , n 4
1955
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Streamlined maintenance cuts costs
Engineering Index Backfile | 1956
|Streamlined maintenance cuts costs
Engineering Index Backfile | 1955
|STREAMLINED MAINTENANCE CUTS COSTS
SAE Technical Papers | 1955
|Replacement gyro planned for ISS . Arianespace cuts its costs
Online Contents | 2002
Overcoating Cuts Bridge Maintenance Costs
British Library Online Contents | 1992