Procedure used by Sperry Gyroscope Co, Great Neck, NY, where plant covers 2,500,000 sq ft of floor space, and some 40 electric power trucks are required for internal transportation; truck costs were cut by scheduling battery and truck servicing, daily work reports and setting up complete equipment records; one man per shift handles maintenance.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Planned maintenance cuts truck costs


    Additional title:

    Mill Factory


    Contributors:

    Published in:

    Publication date :

    1955


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Streamlined maintenance cuts costs

    Taussig, W.A. | Engineering Index Backfile | 1956


    Streamlined maintenance cuts costs

    Taussig, W.A. | Engineering Index Backfile | 1955


    STREAMLINED MAINTENANCE CUTS COSTS

    TAUSSIG, WARREN A. | SAE Technical Papers | 1955



    Overcoating Cuts Bridge Maintenance Costs

    British Library Online Contents | 1992