Development of gas turbine machinery for medium size tankers and other merchant ships; results, with fuel data, etc, for first, 1200-hp unit to supply about quarter power (see also Engineering Index 1956 p 968); installation of 5500-hp set as sole means of propulsion; shp of 5300 compares with 3850 shp from three diesel engines and 1200hp unit; machinery diagrams. (See also ASME -- Paper n 58 -- GTP-12 for meeting Mar 2-6 1958 28 p; Motor Ship v 39 n 455 Apr 1958 p 6; Shipbldg and Shipg Rec v 92 n 9 Aug 28 1958 p 272-3)
"Auris" gas-turbine project
Mar Engr Naval Architect
Marine Engineer and Naval Architect ; 81 , n 982
1958
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1958
|Engineering Index Backfile | 1958
|Gas-turbine operating experience in tanker "Auris"
Engineering Index Backfile | 1953
Auris statt Corolla: neuer Toyota Auris
Automotive engineering | 2006
|