Gives studies of feeder requirements for return circuits, results of tests, etc., as reported by the Board of Supervising Engineers. (2500 w.) (No. 33912)
Electrical transmission and distribution on Chicago traction lines
Elec Ry Jour
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Track reconstruction by the Chicago electric traction lines
Engineering Index Backfile | 1907
Continuous rail for Chicago street traction
Engineering Index Backfile | 1913
The status of the Chicago traction problem
Engineering Index Backfile | 1906
|Transportation in Chicago during a traction strike
Engineering Index Backfile | 1915
$96,371.300 expenditure by 1926 recommended for Chicago traction
Engineering Index Backfile | 1916