Minutes of meetings; manufacturers' statements as to volume and equipment of hydroelectric installations; during past 12 months orders were placed for Smith turbines developing more than 591,000 hp., including 81,900 hp. in propeller-type units; Flow Measurement and Forecasting at Holtwood, H. W. Lowy; Output Standards for Hydraulic Units, C. W. Watchorn; Keeping Daily Record of Capacity of Hydro Units, R. D. Shaub; Distribution of Runoff and Rainfall in Susquehanna Valley, C. F. Merriam and E. S. Loane; Seiches in Conowingo Pond, R. Taylor and R. E. Turner; Progress in Remodeling York Haven Hydro-Electric Station, A. W. Reid; list of dam failures.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Report of hydraulic power committee (Eng. Sec.) presented at 23rd annual mtg. of Pa. Elec. Assn. (Eastern Geographic Div. N.E.L.A.)


    Additional title:

    Report Hydraulic Power Committee


    Contributors:

    Conference:

    23rd Annual Meeting of Pacific Electrical Association ; 1930 United States



    Publication date :

    1930


    Remarks:

    Numerous Figs., Tables


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English