Outline of speed for construction of twin railroad tunnels of curved alignment, to avoid great depths encountered in middle of straight-line tunnel; length 37.7 km; max depth 360 m as compared with 525 m of other alignments proposed. (see also Ry Gaz v 56 n 5 Jan 29 1932 p 139-41)
Tunnelling straits of Gibraltar
Ry Engr
Railway Engineer ; 53 , n 625
1932
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnelling straits of Gibraltar
Engineering Index Backfile | 1932
|Tunnel under the straits of Gibraltar
Engineering Index Backfile | 1930
|Tunnelling the strait of Gibraltar
Engineering Index Backfile | 1929
|Italian and German Submarine Passage of the Straits of Gibraltar in the Second World War
Taylor & Francis Verlag | 2023
|Online Contents | 1999