With cars operating overhead, work on Governor Square subway extension in Boston continues at record speed, with Boston Elevated Railroad reaping economies through low prices of materials and labor. (See also Elec Traction v 28 n 4 Apr 1932 p 152-4)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Boston builds subway while cars operate above


    Additional title:

    Traction Shop Roadway


    Contributors:

    Published in:

    Publication date :

    1932


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Boston builds subway while cars operate above

    Hollingsworth, F.N. | Engineering Index Backfile | 1932


    Los Angeles builds a subway

    Engineering Index Backfile | 1924


    France builds armored cars

    Bradley, W.F. | Engineering Index Backfile | 1914


    Who builds cars best?

    Ealey,L.A. | Automotive engineering | 1985


    Opening of the Boston subway for the west end trolley cars

    Weller, H.W. | Engineering Index Backfile | 1897