Fifth and sixth signal projects involved in rearrangement and reconstruction of yard and terminal facilities at Galesburg, Ill, on Chicago, Burlington and Quincy, are Waterman interlocking, and Graham interlocking, respectively; two separate plants controlled from one tower; electropneumatic system for adjacent plant; code-type remote control for distant layout.
Burlington's reconstruction program at Galesburg involves modern interlocking plants
Ry Signaling
Railway Signaling ; 25 , n 12
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Burlington's water supply at Galesburg
Engineering Index Backfile | 1901
The Burlington's construction organization
Engineering Index Backfile | 1913
The galesburg timber preserving plant of the Burlington
Engineering Index Backfile | 1908
The Burlington tie-preserving plant at Galesburg
Engineering Index Backfile | 1908
Automatic interlocking involves two crossings
Engineering Index Backfile | 1937