Atchison, Topeka and Santa Fe has installed centralized control, including signals for directing train movements in either direction on both tracks of 12.2-mi section of double track between Holliday, Kans, and Olathe; track and signal plan of controlled territory; details of layout and equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Centralized traffic control saves time on Santa Fe


    Additional title:

    Ry Signaling


    Contributors:

    Published in:

    Publication date :

    1932


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Centralized traffic control saves time on Santa Fe

    Fuller, D.W. | Engineering Index Backfile | 1931





    C.T.C. saves train time on Santa Fe

    Engineering Index Backfile | 1947