Apr n 4 1929 p 185-188: Study of use of concrete in street railway track construction and standard design of track structure for economy and long life; elasticity; rail vs. foundation rigidity; relative costs of steel and concrete in road-bed; standard monolithic concrete track structure. Sept n 9 1929 p 480-482: Competition in electric railway industry emphasizes importance of giving thorough consideration to economic aspects of track construction and design; new facts concerning methods of construction and costs are advanced for consideration of electric railway industry; first article takes up theory and elasticity of rigid track. Oct n 10 1929 p 558-560: Continued discussion of design features of street-railroad tracks; problems concerned with loads and impact. Nov n 11 1929 p 599-602: Importance of ties, rail fastenings and joints in producing economical and strong track structure emphasized. (see also Traction Shop and Roadway, vol. 2, nos. 4 and 9, Apr. and Sept. 1929, pp. 111-113 and 276-278, 6 figs.)
What's wrong with paved track construction?
Elec. Traction
Electric Traction ; 25 , n 4, 9-11
1929
18 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
What's wrong with paved track construction?
Engineering Index Backfile | 1929
|Track construction in paved streets
Engineering Index Backfile | 1907
|Economics of paved track design and construction
Engineering Index Backfile | 1929
|Economics of paved track design and construction
Engineering Index Backfile | 1929
|Street railway track construction in paved streets
Engineering Index Backfile | 1916
|