Solution of difficult traffic problems by West Virginia Road Commission in resurfacing and widening eight miles on U. S. Route no. 60, from Belle to Cedar Grove, West Virginia; during peak traffic hour 400 to 500 vehicles pass over this road; one-half road curb was constructed first for distance of four miles; then other half was completed.
Widening and resurfacing old road without detouring traffic
Pub. Works
Public Works ; 60 , n 12
1929
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Widening and resurfacing the King Edward highway without detours
Engineering Index Backfile | 1926
|Widening and resurfacing old pavements with asphaltic materials
Engineering Index Backfile | 1950
|Research on Vehicles’ Detouring Route Choice Behavior under Traffic Accident Conditions
Trans Tech Publications | 2012
|Research on Vehicles’ Detouring Route Choice Behavior under Traffic Accident Conditions
Tema Archive | 2012
|The Effect on Traffic Speeds of Resurfacing a Road
NTIS | 1980
|