Increased attention has been given during year to application of signals and power switches; automatic-block signals completed in 1928; interesting features of interlocking plants constructed in 1928; car retarders installed; highway-crossing protection increasing; construction under way; train control in 1928.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Signaling construction continues in average volume during 1928


    Additional title:

    Ry. Age


    Contributors:
    Dunn, J.H. (author)

    Published in:

    Railway Age ; 86 , n 1


    Publication date :

    1929


    Size :

    7 pages


    Remarks:

    2 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Signaling construction continues in large volume

    Dunn, J.H. | Engineering Index Backfile | 1928


    Signaling construction continues in large volume

    Dunn, J.H. | Engineering Index Backfile | 1928


    Traffic volume continues heavy

    Layng, C. | Engineering Index Backfile | 1945