Experiences in railway traffic working; operation of 44 Sentinel-Cammell coaches (24 chain driven and 20 gear driven) and 10 Clayton coaches by London and North Eastern Railway Co. is described; methods of working; haulage capacity; light locomotives in freight service; economies in pick up working; scope for further investigation; 200-hp. coach next. Abstract of paper presented before London and North Eastern Railway Lecturing and Debating Soc.
Light power units
Modern Transport
Modern Transport ; 20 , n 513
1929
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Light power units for railway service
Engineering Index Backfile | 1928
Light power units for railway work
Engineering Index Backfile | 1929
Light-Weight Transportation Units
SAE Technical Papers | 1939
|Light-weight transportation units
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1948