Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (See also Elec. Rev vol. 104, no. 2683, Apr. 26, 1929 pp. 729-731, 5 figs; Ry. Gaz., vol. 50, no. 21, May 24, 1929, pp. 774-775, 4 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310,5 figs.; and Elec. Ry., Bus and Tram Jl, vol. 60, no. 1509, June 14, 1929, pp. 351-352, 4 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The Central argentine railway


    Additional title:

    Tramway Ry. World


    Published in:

    Publication date :

    1929


    Size :

    3 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    Central Argentine railway electrification

    Engineering Index Backfile | 1935