Largest equipment sent to Australia for Melbourne street railroad has capacity of 500 kw., and is designed to operate on 6600-volt, three-phase system and to feed into 600-volt d.c. two-wire system, plant being arranged for fully automatic control; sub-station is brought into operation by means of voltage relay and/or time switch, and is shut down by means of low-current relay or time switch.
Mercury arc rectifier equipment for the Melbourne tramways
Engineer
Engineer ; 150 , n 3909
1930
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1918
Melbourne and Metropolitan Tramways Board
Engineering Index Backfile | 1920
Rail grinding machine for Melbourne tramways
Engineering Index Backfile | 1928
New cars for the Melbourne, Brunswick, and Coburg tramways
Engineering Index Backfile | 1917
|Engineering Index Backfile | 1907
|