Report on proposed underground rapid transit system for Montreal, as presented by Montreal Tramways Co to Greater Montreal Economic Council; initially, North-South subway following St Lawrence Blvd, and east-west subway following St Catherine Street, are proposed, with complete costs of $37,949,000 for north-south tube, with equipment, and of $22,866,000 for east-west tube, with equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Report on subways for Montreal


    Additional title:

    Can Transportation


    Contributors:
    Watt, R.N. (author)


    Publication date :

    1944


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Rapid transit subways for Montreal

    Engineering Index Backfile | 1945



    Subways?

    Kremer | Engineering Index Backfile | 1931


    Subways

    Engineering Index Backfile | 1929


    Subways

    Engineering Index Backfile | 1928