Report on proposed underground rapid transit system for Montreal, as presented by Montreal Tramways Co to Greater Montreal Economic Council; initially, North-South subway following St Lawrence Blvd, and east-west subway following St Catherine Street, are proposed, with complete costs of $37,949,000 for north-south tube, with equipment, and of $22,866,000 for east-west tube, with equipment.
Report on subways for Montreal
Can Transportation
1944
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid transit subways for Montreal
Engineering Index Backfile | 1945
'Subways are Not Outdated': Debating the Montreal Metro, 1940-60
Online Contents | 2015
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1928