Details of project between Walkerville Junction and yard at Windsor, Ont, which includes 3 mi of main line and two layouts involving junctions as well as two crossings.
Canadian pacific installs centralized traffic control
Ry Signaling
Railway Signaling ; 37 , n 2
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian Pacific installs centralized traffic control to solve operating problem
Engineering Index Backfile | 1930
Canadian pacific installs centralized traffic control to solve operating problem
Engineering Index Backfile | 1929
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Canadian national installs centralized traffic control on 117-mile sub-division
Engineering Index Backfile | 1951