Design and construction problems on expressway's, 5.8-mi, $11, 000,000 Section 3, which is to be completed this year linking Willow Run Expressway System with City of Detroit.
Detroit industrial expressway
Roads Streets
Roads and Streets ; 87 , n 8
1944
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Detroit industrial expressway engineering provisions for high speed traffic
Engineering Index Backfile | 1943
|John C. Lodge expressway, Detroit
Engineering Index Backfile | 1944
|Detroit expressway built for safety
Engineering Index Backfile | 1944
Expressway and industrial location
Engineering Index Backfile | 1958
|