Detailed description of methods and equipment used in constructing and paving municipal airport; project included 33,000 cu yd of vinsol resin concrete pavement, about 100,000 cu yd of shallow field stripping and leveling, 170,000 cu yd of drainage channel excavation, 16,000 lin ft of concrete pipe drainage and sundry items.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Ready-mix at Niagara Falls Airport


    Additional title:

    Roads Streets


    Contributors:

    Published in:

    Publication date :

    1944


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    The Gorge road at Niagara falls

    Engineering Index Backfile | 1896


    Buffalo and Niagara Falls electric railway

    Engineering Index Backfile | 1895


    Niagara Falls: Ion Emission and Sonoluminescence

    Prevenslik, T. V. / Electrostatics Society of America | British Library Conference Proceedings | 2000


    Buffalo-Niagara Falls high-speed line

    Engineering Index Backfile | 1917


    Quick service between Buffalo and Niagara falls

    Engineering Index Backfile | 1918