Completion of headings for nearly one-third of its total length of 6. 1 mi.; how east headings are being driven; power equipment for mucking; problems presented by headings at west end.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Work on moffat tunnel now in full progress


    Additional title:

    Ry. Age


    Published in:

    Railway Age ; 77 , n 20


    Publication date :

    1924


    Size :

    6 pages


    Remarks:

    11 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Work on moffat tunnel forging ahead

    Betts, C.A. | Engineering Index Backfile | 1926


    Construction of the Moffat tunnel

    Gabelman, C.G. | Engineering Index Backfile | 1928


    The Moffat tunnel through the Rocky Mountains

    Engineering Index Backfile | 1926


    Fighting rail corrosion in 6.21-mile Moffat tunnel

    Jones, W.C. | Engineering Index Backfile | 1938