Bridge has span of 640 ft. from center to center of hinge pins and rise of 105 ft.; planned to carry two railway trucks on deck at 13-ft centers, and designed for cantilever method with pin bearing between two halves of lower chord at crown; noteworthy features of erection; closing operations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New Niagara Gorge arch nearing completion


    Additional title:

    Ry. Age


    Published in:

    Railway Age ; 77 , n 19


    Publication date :

    1924


    Size :

    7 pages


    Remarks:

    10 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Extending the life of the Niagara Gorge arch

    Engineering Index Backfile | 1920


    The Gorge road at Niagara falls

    Engineering Index Backfile | 1896




    Cleveland terminal project nearing completion

    Faust, C.A. | Engineering Index Backfile | 1929