Editorial discussion of jury decision of railway disaster at Welwyn Garden City on June 15th, stating that it was not caused by driver of parcels train over-running his signals; it is, however, fairly obvious that fault lay in method by which block system was worked; track circuiting suggested as remedy.
Automatic train control and track circuit
Engineer
Engineer ; 160 , n 4148
1935
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Autonomous Train Control and Track Circuit Inspection System
British Library Conference Proceedings | 2013
|TRACK CIRCUIT DEVICE AND TRAIN ON-TRACK DETERMINATION METHOD
European Patent Office | 2025
|TRACK CIRCUIT DEVICE AND TRAIN ON-TRACK DETERMINATION METHOD
European Patent Office | 2023
|Communication method of train control center and track circuit
European Patent Office | 2022
|