Complete electrification works for suburban lines, which extend from Buenos Aires to foot of Andes, include power station of 25,000-kw. capacity, 72.5 mi. of high-tension cables, four traction substations with 15,000 kw. of converting plant, and electrical equipment of 70 mi. of single track. See also Elec. Times, vol. 63, no. 1648, May 17, 1923, pp. 499-503, 7 figs., and Ry. Age, vol. 38, no. 20, May 18, 1923, pp. 756-762 and 764, 16 figs. (10 Figs. partly on p. 526)
Railway electrification in South America
Engineer
Engineer ; 135 , n 3516
1923
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway electrification in South America
Engineering Index Backfile | 1923
South african railway electrification
Engineering Index Backfile | 1927
South african railway electrification
Engineering Index Backfile | 1930
Railway electrification in South Africa
Engineering Index Backfile | 1933
|Railway electrification in South Africa
Engineering Index Backfile | 1925
|