Channel Tunnel Railway will leave existing main line from London to Dover at point 3 mi on London side of Folkestone, and will proceed over open country to foot of hills just east of Folkestone, where each line will pass into separate tunnel constructed in lower chalk stratum; outcrops at this point; total length of railway will be 44 mi; practicability of tunnels; estimated cost; proposed Channel tunnel shown in drawing.
Channel tunnel
Int Ry Congress Assn -- Bul
1950
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1924
British Library Online Contents | 1998
British Library Conference Proceedings | 1995
|