Technique discussed provides means of planning fixed-time scheme for freeway entrance ramps, and for estimating demand-time functions at several bottlenecks on Gulf Freeway, Houston, Tex; illustrative example is presented for application of method; system of controls developed.
Estimation of demand at freeway bottlenecks
Traffic Eng
Traffic Engineering ; 35 , n 5
1965
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconsidering Freeway Bottlenecks
Transportation Research Record | 2005
|Optimal Control of Freeway Networks with Bottlenecks and Static Demand
Transportation Research Record | 2005
|PART 1 - FREEWAY OPERATIONS - Optimal Control of Freeway Networks with Bottlenecks and Static Demand
Online Contents | 2005
|Flow Breakdown at Freeway Bottlenecks
Transportation Research Record | 2009
|Optimal Control of Freeway Networks with Bottlenecks and Static Demand
Transportation Research Record | 2005
|