Illustrated description of construction of 48-in. water pipe line in Newark, NJ; at one point it passes under three tracks of Erie Railroad; it was decided to drive tunnel under tracks, using pressed steel line plates; prefabricated 5-ft sections of reinforcing steel could be moved as unit into tunnel; welding and other operations described. From paper in competition of James F. Lincoln Arc Welding Foundation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Prefabricated reinforcing steel for tunnel lining


    Additional title:

    Civ Eng (NY)


    Contributors:

    Published in:

    Publication date :

    1943


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Non-linear stiffness behavior and analysis of tunnel lining with reinforcing bar

    Aruga, Takashi / Arai, Yasushi / Tsuno, Kiwamu | IuD Bahn | 2007



    Non-linear Stiffness Behavior and Analysis of Tunnel Lining with Reinforcing Bars

    Aruga, T. / Arai, Y. / Tsuno, K. | British Library Online Contents | 2007


    Tunnel lining tests

    Matsuda, Y. | British Library Online Contents | 2001


    Lining the Connaught tunnel

    Ry, C.P. | Engineering Index Backfile | 1925