Illustrated description of construction of 48-in. water pipe line in Newark, NJ; at one point it passes under three tracks of Erie Railroad; it was decided to drive tunnel under tracks, using pressed steel line plates; prefabricated 5-ft sections of reinforcing steel could be moved as unit into tunnel; welding and other operations described. From paper in competition of James F. Lincoln Arc Welding Foundation.
Prefabricated reinforcing steel for tunnel lining
Civ Eng (NY)
Civil Engineering (New York) ; 13 , n 6
1943
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Non-linear Stiffness Behavior and Analysis of Tunnel Lining with Reinforcing Bars
Online Contents | 2007
|Non-linear Stiffness Behavior and Analysis of Tunnel Lining with Reinforcing Bars
British Library Online Contents | 2007
|British Library Online Contents | 2001
|Engineering Index Backfile | 1925
|