Procedures for planning metropolitan airport system are suggested; objective is to integrate airport system planning with highway and mass transit planning within context of long-range comprehensive planning program; suggested planning approach is short-range (5-yr) airport system development plan based on long-range comprehensive planning program for entire metropolitan area; operational short-range development plan is composed of three elements -- changes in scheduling, expansion of existing airports, and addition of new airports to system.
Planning metropolitan airport system
Nat Research Council -- Highway Research Board -- Research Rec
1965
22 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Newark metropolitan airport
Engineering Index Backfile | 1928
Metropolitan Washington Airport Investment Requirements
NTIS | 1977
|Airport Traffic and Metropolitan Economies
Online Contents | 2015
|The Los Angeles metropolitan airport
Engineering Index Backfile | 1929
|Metropolitan Washington Airport Policy Analysis
NTIS | 1977
|