Project being constructed by Triborough Bridge and Tunnel Authority, consists of two parallel tubes, each providing for two lanes of traffic, stretching 9117 ft portal to portal; max depth of roadway is 115 ft below mean high water; power for derrick used in construction is supplied by 150-hp D13000 Caterpillar Diesel engine; compressed air supplied by 16 Caterpillar (D13000) driven, Gardner-Denver air compressors.
Diesels help build Brooklyn-Battery Tunnel
Diesel Power
Diesel Power and Diesel Transportation ; 27 , n 8
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Brooklyn-battery tunnel, New York
Engineering Index Backfile | 1950
Industry news - JCB To Build Diesels
Online Contents | 2003
Industry news - JCB To Build Diesels
Online Contents | 2003
850 MHz measurements in the Brooklyn/Battery tunnel
Tema Archive | 1985
|Fuel-filter tests help safeguard marine diesels
Tema Archive | 1989
|