Design and construction details of AW.650 aircraft, designed for freighting and maximum payload of 27,000 lb; introduction of Redux-bonding and set-up of new 5500 sq ft Redux-bonding shop, covering pretreatment, adhesive application and autoclave installation built by Scholtz of Germany; bonding technique; design problems imposed; design details of freight hold; results of fatigue tests.
Redux-bonding in armstrong whitworth argosy
Aircraft Production
Aircraft Production ; 21 , n 6
1959
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Armstrong-Whitworth "Argosy"
Engineering Index Backfile | 1926
The Armstrong-Whitworth "Argosy "
Engineering Index Backfile | 1926
SAFETY IN NUMBERS: THE ARMSTRONG WHITWORTH ARGOSY
Online Contents | 1995
|Picture of the Month - A superb portrait of an Imperial Airways Armstrong Whitworth Argosy
Online Contents | 2008