Swamps on right-of-way of 156-mi road necessitated removal of over 4,000,000 cu yd of peat, muck and marl and backfilling with 5,000,000 cu yd of granular borrow for special fill; work has been done largely with draglines assisted by dump wagons, dump trucks, scrapers and dozers; jetting was used in three locations to help expediate work and provide additional consolidation of granular fill. (see also World Construction v 10 n 3 Mar 1957 p 43-4, 46, 48, 50, 55)
Swamp filling methods on Indiana toll road
Roads Streets
Roads and Streets ; 100 , n 1
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Toll factors for Indiana turnpike
Engineering Index Backfile | 1960
|Wiley | 2012
|Reconstruction of northern Indiana road
Engineering Index Backfile | 1914
British Library Conference Proceedings | 1995
|TOLL ROAD USER SUPPORT DEVICE, TOLL ROAD USER SUPPORT METHOD, AND PROGRAM
European Patent Office | 2019
|