Problems of transporting materials and construction on highway between Guatemala and Panama include clearings, soils, drainage structures and bridges, and sanitation; types of equipment used are described. (p 71-73, 134, 136, 138, 140, 142, 144, 146, 148)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Construction details on inter-American highway


    Additional title:

    Construction Methods


    Contributors:
    James, E.W. (author)

    Published in:

    Publication date :

    1944


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Inter-American highway

    James, E.W. | Engineering Index Backfile | 1943


    Proposed inter-American highway

    Engineering Index Backfile | 1934



    Inter-American highway reconnaissance in Central America

    James, E.W. / Brown, D.T. | Engineering Index Backfile | 1934


    Inter-American highway cuts through Costa Rican Mountains

    Harrison, J.L. | Engineering Index Backfile | 1945