Railroad substations of Bone-Oued-Keerit line; indoor and outdoor substations on electrified railroad in Algeria received high voltage at 90 kv which is transformed into direct current of 3000 v; general description of substation employing motor-generator and 12 anode mercury-vapor rectifiers.
Railroad substations of Bone-Oued-Keerit line
Les sous-stations de traction de la ligne de Bone a Oued-Keberit
Revue Generale de l'Electricite ; 35 , n 7
1934
9 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of line from Bone to Oued-Keberit on Algerian State Railroad
Engineering Index Backfile | 1934
|Railroad substations on Lyons-Culoz line, France
Engineering Index Backfile | 1954
|Railroad substations for 1500-v d-c
Engineering Index Backfile | 1948
|Equipment for regeneration in D.C. railroad substations
Engineering Index Backfile | 1930
|Evolution of electric railroad substations in France
Engineering Index Backfile | 1950
|