Description of centralized traffic control installations completed on 89.7 mi of road's single track, enabling it to absorb increase over normal of from 32 to 60 trains daily, without delays. (see also Ry Signaling v 35 n 12 Dec 1942 p 682-7)
C.T.C. solves war traffic problem on Texas and Pacific
Ry Age
Railway Age ; 113 , n 22
1942
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. solves War traffic problem on Texas and Pacific
Engineering Index Backfile | 1942
C.T.C. solves track capacity problem on seaboard
Engineering Index Backfile | 1942
C.T.C. solves track capacity problem on seaboard
Engineering Index Backfile | 1942
C.T.C. solves operating problem on busy single-track line
Engineering Index Backfile | 1948
C.T.C. solves operating problems on Pere Marquette
Engineering Index Backfile | 1945