To relieve congestion, Southern Pacific completed installation of centralized traffic control on 17 mi single-track section of heavy grades and curvature; new signaling facilities immediately reduced overall time of trains, thereby increasing capacity to extent that operations have been facilitated on division as whole; track layout and train movements. (See also Ry Signaling v 35 n 10 Oct 1942 p 538-45)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    C.T.C. saves train time on section of Southern Pacific


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 113 , n 18


    Publication date :

    1942


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    C.T.C. saves train time on Pennsylvania

    Engineering Index Backfile | 1947


    C.T.C. saves train time on Pennsylvania

    Engineering Index Backfile | 1947


    C.T.C. saves train time on Santa Fe

    Engineering Index Backfile | 1947


    C.T.C. saves train time on Santa Fe

    Engineering Index Backfile | 1947