On Erie Railroad, emphasis is placed on desirability of keeping stone ballast clean and maintaining proper ballast section; reasoning behind this policy; methods, gang organization and equipment employed in putting it into practice; how ballasting and resurfacing operations are coordinated with other maintenance work to produce track that will require minimum of attention and maintenance expense for years to come. Before Metropolitan Maintenance of Way Club.
Ballast gets special attention on Erie
Ry Eng Maintenance
Railway Engineering and Maintenance ; 38 , n 5
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erie uses mechanical ballast shapers
Engineering Index Backfile | 1943
Evonik Ballast Water System Gets Partner
American Chemical Society | 2016
Weed control gets special attention on these lines
Engineering Index Backfile | 1946
Erie adopts special track details
Engineering Index Backfile | 1931
Automotive engineering | 1999
|