First of new class of superheater locomotives completed at works of Southern Railway; engines are being built to cope with heavy wartime traffic, and were designed to meet special requirements of Southern Railway system; dimensions and features of locomotives given. (See also Locomotive (Lond) v 48 n 596 Apr 15 1942 p 79-81; Engineering v 153 n 3980 Apr 24 1942 p 336-7)
New 0-6-0 freight engines, Southern Railway
Engineer
Engineer ; 173 , n 4501
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New 0-6-0 freight engines, Southern Railway
Engineering Index Backfile | 1942
New 0-6-0 freight engines, Southern Railway
Engineering Index Backfile | 1942
Freight car Rehabilitation, Southern railway
Engineering Index Backfile | 1915
Freight traffic on the Southern Railway
Engineering Index Backfile | 1928
Southern railway freight yard at Atlanta, Ga
Engineering Index Backfile | 1907