Construction of extension of North Mole: basic considerations; allowance for settlement; results of shelter provided by work; influence of work on sedimentation at harbor entrance; economy effected, taking into account cost of maintenance. See also Engineering Index 1939 p 145.
Harbour of Leixoes (Oporto), Portugal
Dock Harbour Authority
Dock and Harbour Authority ; 22 , n 258
1942
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Berthing characteristics and the behaviour of the oil terminal of Leixoes Harbour, Portugal
British Library Conference Proceedings | 2005
|Oporto plans second expansion phase
IuD Bahn | 2004
Alfa Pendular Lisboa-Oporto a 220 km/h
IuD Bahn | 2003
|Trenes CP 2000 para las cercanías de Oporto
IuD Bahn | 2003
|