Electrification committee decided in favor of single-phase current, to be taken from 3-phase trunk lines and converted at substations placed 60 mi. or more apart along line; details of Lilla Edet hydroelectric plant of about 40,000 hp.; 4 water-power plants are connected with steam power station at Vasteras, containing 4 turbines of about 60,000 hp. capacity, 2 of Stal and 2 DeLaval make, 3 generators being built by Asea.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electrification of the railway Stockholm-Gothenburg


    Additional title:

    Swedish Export


    Published in:

    Swedish Export ; 11 , n 2 ; p 15-19


    Publication date :

    1927


    Size :

    5 pages


    Remarks:

    8 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    The Stockholm-Gothenburg electrification

    Engineering Index Backfile | 1930


    Stockholm-Roslagen railway electrification

    Engineering Index Backfile | 1942


    The Stockholm-Goteborg Electrification

    Engineering Index Backfile | 1927


    Centralizing the railway service in Gothenburg

    Toerjeson, T.A. | Engineering Index Backfile | 1930


    Stockholm-Goteborg electrification recently completed

    Neithammer, F. | Engineering Index Backfile | 1926