New twin-chamber lock to relieve traffic; 1000-ton boat to be handled in single-lock chamber.
The new locks at Fuerstenberg-on-the Oder
Eng. Progress
Engineering Progress ; 8 , n 2
1927
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cable towing plant of twin shaft lock at Fuerstenberg on the Oder
Engineering Index Backfile | 1930
|Winter Season Repairs of the Oder Locks
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1997
|Engineering Index Backfile | 1926
|Engineering Index Backfile | 1897
|